News In Brief

Siberian track may be laid before any engine is ready

Soviet engineers have failed so far to develop a locomotive capable of withstanding the harsh conditions on the country's premier construction project, the new trans-Siberian railway, its chief said Wednesday.

''Every new model of locomotive produced in the past few years has been heralded as specially designed for BAM (the Baikal-Amur Railway), but not one has stood the test,'' BAM chief Valery Gorbunov wrote in the party daily, Pravda. ''We need a powerful locomotive, capable of pulling heavy trains in temperatures ranging from plus 40 C. (104 F.) to -60 (-76 F.),'' he said.

The new 2,200-mile railway is due to be opened by Nov. 7 but still faces a large number of difficulties.

About these ads
Sponsored Content by LockerDome

We want to hear, did we miss an angle we should have covered? Should we come back to this topic? Or just give us a rating for this story. We want to hear from you.

Loading...

Loading...

Loading...

Save for later

Save
Cancel

Saved ( of items)

This item has been saved to read later from any device.
Access saved items through your user name at the top of the page.

View Saved Items

OK

Failed to save

You reached the limit of 20 saved items.
Please visit following link to manage you saved items.

View Saved Items

OK

Failed to save

You have already saved this item.

View Saved Items

OK