Past STS achievements

* April 12-14, 1981. Columbia completed 36 orbits in a successful 54-hour mission.

* Nov. 12-14, 1981. Completed 36 orbits after fuel-cell problems reduced the planned 124-hour mission to 54 hours.

* March 22-30, 1982. The shuttle stretched a seven-day trip into eight days due to poor landing conditions. The extended flight demonstrated the program's flexibility.

* June 27-July 4, 1982. The mission ended the STS test phase, despite loss of the rocket boosters, which sank before recovery.

* Nov. 11-16, 1982. The first operational STS flight included mission specialists. The major objective of the flight was the launching of two commercial satellites. Pressure-suit problems scrubbed a planned spacewalk.

About these ads
Sponsored Content by LockerDome

We want to hear, did we miss an angle we should have covered? Should we come back to this topic? Or just give us a rating for this story. We want to hear from you.

Loading...

Loading...

Loading...

Save for later

Save
Cancel

Saved ( of items)

This item has been saved to read later from any device.
Access saved items through your user name at the top of the page.

View Saved Items

OK

Failed to save

You reached the limit of 20 saved items.
Please visit following link to manage you saved items.

View Saved Items

OK

Failed to save

You have already saved this item.

View Saved Items

OK